The Heating and A/C plan at our church is awful

The Heating and A/C plan at our church building is just awful.

We seem love both of us have troubles with the Heating and A/C zone control literally all the time at the church.

We decided to get zone control heating and cooling when both of us first moved into the building a few years ago. We thought that it made more sense to do zone control in the building since both of us didn’t entirely need to be heating and cooling the entire building all the time. For instance, in the Summer when both of us do holiday bible university, both of us only need to have the air conditioning turned on in the classroom section of the building. We don’t entirely need to have the cooling unit running in the auditorium and the home office and everywhere else in the building. We would be paying a luck in cooling costs if both of us didn’t have zone control heating and cooling in the building. I know that both of us entirely need to do some Heating and A/C maintenance work at the church however at this point, I’m not entirely sure what both of us need to do, however probably, both of us need to have a completely new Heating and A/C plan installed in the church. Of course, that costs a heck of a lot of currency and if both of us add an Heating and A/C service plan too, it’s going to cost us even more, and the people at church are never going to go for it, even if I recommend spending currency on a new Heating and A/C system. They recognize that both of us should give all of our currency to help other people instead of using it to make us more comfortable inside the building.

 

Live link

Leave a Reply

Your email address will not be published. Required fields are marked *